top of page
Quantity Surveying & Estimation Costing of Civil Works

Quantity Surveying & Estimation Costing of Civil Works

SKU: QSESTIMATIONCOURSE
  • Understanding the Role of BHADANI'S Quantity Surveying in the Construction Industry

  • Quality Control and Quality Assurance Basics 

  • Construction Methodologies of Civil Works and How it works in Construction Industry
  • Construction Activities Identification Analysis and Report Generation
  • Making Project Chartered and Feasible Reports
  • Project Risk Analysis and Action Reports
  • Understanding and Reading the Structural and Architectural Drawings
  • Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc.
  • Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.)
  • Faster Take off Methodologies from Drawings of Civil
  • Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
  • Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards
  • Estimation of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
  • Estimation Technique  During Design Phase 
  • Estimation Technique During Pre-Construction Phase
  • Estimation Technique During Post-Construction Phase
  • Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
  • Pre-Engineered Building (PEB) Estimation 
  • Costing Techniques of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING
  • Costing Techniques- Risk Based Costing
  • Costing Techniques - Parametric Costing
  • Costing Techniques - Machinery Transport Management and Costing
  • Costing Techniques - Scope Estimation and Cost Analysis
  • S-Curve Reporting 
  • Labour Deployment Planning As per Budget 
  • Labour Economics and Productivity Analysis
  • Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique
  • Economic Order Quantity (EOQ) and Management
  • Machinery Output Analysis as per Market Standards
  • Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
  • Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
  • Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.
  • ​Bill of Quantity (BOQ) Take off (Material and Preparation)
  • Rate Analysis of All Kinds of Civil Works
  • Material Reconciliation Techniques from Contractor and Client's Side
  • Material Procurement Strategies as per the techniques used in Quantity Surveying
  • FREE  LANCE Quantity Surveying with Hands on Practice
  • QUANTITY SURVEYING

    IT IS VERY USEFUL ONLINE TRAINING MODULE FOR THOSE WHO ARE BEGINNERS OR HAVING UPTO 3 YRS. OF WORKING EXPERIENCE

  • Mode of Training Through Zoom Meeting Software

    Online Training is a Live Session Training with Zoom Meeting Software

  • HOW TO APPLY:

    Whatsapp us at +919911259530 or Call us at +919990990844 or Email us at billingengineers@gmail.com with your whatsapp number

₹22,500.00 Regular Price
₹16,875.00Sale Price
Product Page: Stores_Product_Widget