top of page
This course can no longer be booked.

Quantity Surveying & Estimation Training

Become a Professional Quantity Surveyor

  • Ended
  • 22,000 Indian rupees
  • Pune

Service Description

Understanding the Role of BHADANI'S Quantity Surveying in the Construction Industry Checklist of All Kinds of Civil Works at Site. Construction Methodologies of Civil Works and How it works in Construction Industry Construction Activities Identification Analysis and Report Generation Making Project Chartered and Feasible Reports Project Risk Analysis and Action Reports Understanding and Reading the Structural and Architectural Drawings Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc. Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.) Faster Take off Methodologies from Drawings of Civil Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards Estimation of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING Estimation Technique During Design Phase Estimation Technique During Pre-Construction Phase Estimation Technique During Post-Construction Phase Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc. Pre-Engineered Building (PEB) Estimation Costing Techniques of All Kinds of CIVIL , INTERIOR, BRIDGE, ROADS, HIGHWAYS, CANAL, CULVERTS, DRAINS, MECHANICAL, ELECTRICAL, PLUMBING , RESIDENTIAL, COMMERCIAL AND INDUSTRIAL PROJECTS TRAINING Costing Techniques- Risk Based Costing Costing Techniques - Parametric Costing Costing Techniques - Machinery Transport Management and Costing ​Costing Techniques - Scope Estimation and Cost Analysis ​S-Curve Reporting Labour Deployment Planning As per Budget Labour Economics and Productivity Analysis Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique Economic Order Quantity (EOQ) and Management​ Machinery Output Analysis as per Market Standards Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc. ​Bill of Quantity (BOQ) Take off (Material and Preparation) Rate Analysis of All Kinds of Civil Works Material Reconciliation Techniques from Contractor and Client's Side Material Procurement Strategies as per the techniques used in Quanti


Contact Details

  • Swargate, Pune, Maharashtra, India

    9990990844

    gauravbhadanicivil@gmail.com


bottom of page